The Invisible Half of the Line

2026-11-07

Latest company case about The Invisible Half of the Line

CASE STUDY 05  ·  COATTECH PROJECTS

The Invisible Half of the Line

DI water storage, process piping and the utility backbone

 CoatTech CT-ED-7200   |   Client name withheld under NDA

 

 

SERIES CONTEXT   ·   PART 05 OF 05

What is the first thing to check when an ED bath starts producing pinholes? Not the rectifier — the water. Case 05 closes the series at the least photographed part of the CoatTech CT-ED-7200 line: a 2 m³/h RO + EDI plant, a white vertical storage tank and five separate pipe circuits feeding the final rinse, UF return, anolyte, cooling and chemical dosing. Holding the last rinse below 25 μS/cm kept bath conductivity at 1,420 μS/cm and helped cut VOC from 42.6 to 3.1 t/a. The preceding four cases cover the conveyor, PLC control, the bath system and the cure tunnel; all five are collected in the master case.

 

01  Layout

02  Control

03  Baths

04  Rinse & Cure

05  Water

 

 

01:34  ·  Large white vertical storage tank and the process piping network

FRAME NOTE

Replace the low-resolution preview still with the HD tank-and-piping shot at 01:34. A labelled pipe schematic would make a strong second visual.

 

2 m³/h

RO + EDI WATER PLANT

< 10 μS/cm

PRODUCT WATER CONDUCTIVITY

−93 %

VOC EMISSIONS VS. OLD LINE

 

THE SCENE

A large white vertical PE tank stands against the corrugated wall, surrounded by a dense network of process pipes and valves. It is the least glamorous frame in the video — and the one that most often decides whether an E-coat line runs cleanly or spends its life chasing pinholes.

WHAT YOU ARE LOOKING AT

The tank is deionised water storage fed by an RO + EDI plant at 2 m³/h, product conductivity below 10 μS/cm. It supplies the final pre-treatment rinse, the post-ED fresh DI spray and all bath make-up. The pipe network around it separates five independent circuits: DI supply, UF permeate return, anolyte circulation, cooling water to the plate heat exchanger, and chemical dosing to the pre-treatment tanks. Keeping those circuits separate — and keeping the last rinse below 25 μS/cm — is what stops phosphate salts and stray ions from accumulating in the ED bath.

KEY SPECIFICATION

Utilities & water

Specification

DI water plant

RO + EDI, 2 m³/h, product < 10 μS/cm

Final rinse quality

< 25 μS/cm, checked daily

Storage

Vertical PE tank with level control and recirculation loop

Cooling

120 kW chiller + plate heat exchanger, bath held at 28 ± 1 °C

UF loop

Permeate cooled below 33 °C to protect membrane life

Compressed air

6 bar, clean and dry, for air knives and pneumatic valves

Environmental

VOC 42.6 → 3.1 t/a; rinse section closed loop; phosphate sludge dewatered on site

 

WHY IT MATTERS

When bath conductivity climbs, the first question a process engineer asks is not about the rectifier — it is about the water and the last rinse. High conductivity produces rough film and pinholes; iron ions carried in from poor rinsing shorten salt-spray life and blind the UF membranes. This subsystem is cheap relative to the tanks, which is exactly why it is under-specified on inexpensive lines and why we size it generously.

RESULT  ·  Final rinse < 25 μS/cm   ·   Bath conductivity 1,420 μS/cm, stable   ·   VOC −93 %

 

CONTINUE THE SERIES

This is the final part.   Read the the full CT-ED-7200 project, from tanks to cure for the complete project, all eight video frames and the full before / after results.

 

Figures were recorded during commissioning and the first six months of series production on the CoatTech CT-ED-7200 line. Client name withheld under NDA. Preview stills are low-resolution crops from the project video contact sheet; replace with HD frames before publication.

 

CoatTech Intelligent Equipment (Guangzhou) CO., LTD

Spray booths · paint booth man lifts · E-coat and pre-treatment lines · overhead conveyor coating lines · curing ovens.  No. 7 West Station South Road, Kechuang Yunzhihui, C Floor, Shishan Town, Nanhai District, Foshan, China   |   coattech@spraying-booth.com   |   +86 189 8118 9424   |   www.spraying-booth.com

 


Youtube Video for your reference


https://youtube.com/shorts/Ov19gypUkog?si=YOlacgo-utNsXqtU 


 

sitemap |  Privacy Policy | China Good Quality Spray Booth Supplier. Copyright © 2024-2026 CoatTech Intelligent Equipment(Guangzhou) CO.,LTD . All Rights Reserved.