A leading industrial company in Malaysia reached out to us with a specialized layout requirement for their site expansion. The client needed a compact, efficient, and environmentally compliant surface preparation and protective coating line within a 12x12 meter workshop footprint.
1.Footprint Constraints: Both the abrasive blasting booth and the paint spray booth needed to fit side-by-side within a restricted 12*12 meter plant layout.
2.Workpiece Dimensions: Designed to handle heavy steel pipes up to 6 meter
3.Environmental Compliance: A customized 20 meter height exhaust chimney/stack was required to meet local Malaysian Department of Environment (DOE) air emission regulations.
Based on the preliminary site sketch and technical parameters, our engineering team provided an optimized dual-booth layout:
Enclosure: Heavy-duty insulated panels lined with wear-resistant rubber sheets.
Abrasive Recovery Options: Mechanical/pneumatic recovery system designed to efficiently handle steel grit and alumina, reducing manual labor.
Dust Collection: High-efficiency reverse-pulse cartridge filter system ensuring clear visibility during operation.
Airflow Design: Downward/cross-draft airflow system ensuring uniform paint mist filtration.
Exhaust & Filtration: Multi-stage dry filtration paired with a 20meter structural exhaust stack for high-altitude emission compliance.
Handling System: Tailored floor guide/rail cart system for easy loading and unloading of 6m heavy steel pipes.
3. Technical Specifications Table
| Parameter | Abrasive Blasting Booth | Spray Painting Booth |
| External Dimensions | 8m(L)x 5m(W)x4m(H) | 8m(L)x 5m(W)x4m(H) |
| Layout Footprint | Integration 12m X 12m Total Workshop |
Integration 12m X 12m Total Workshop |
| Exhaust Stack Height | Standard Dust Filtration | 20M Vertical Chimney |
| Main Application | Rust Removal, Surface Roughing | Protective Coating, Anti-Corrosion Spraying |
| Compliance | Dust Emission Standards | Local DOE VOC Emission Standards |
A: We integrate customized multi-stage dry arrestor filters/activated carbon systems along with extended vertical exhaust chimneys to meet local air purity and emission height mandates
.
A: Yes! An 8*5 M booth length allows a 1m clearance buffer at both ends, giving operators enough room to maneuver spray equipment or operate automatic rotators for pipe coating.
Whether you have a hand-drawn sketch or complete architectural blueprints, our engineering team can turn your site dimensions into an efficient, compliant surface treatment line.
A leading industrial company in Malaysia reached out to us with a specialized layout requirement for their site expansion. The client needed a compact, efficient, and environmentally compliant surface preparation and protective coating line within a 12x12 meter workshop footprint.
1.Footprint Constraints: Both the abrasive blasting booth and the paint spray booth needed to fit side-by-side within a restricted 12*12 meter plant layout.
2.Workpiece Dimensions: Designed to handle heavy steel pipes up to 6 meter
3.Environmental Compliance: A customized 20 meter height exhaust chimney/stack was required to meet local Malaysian Department of Environment (DOE) air emission regulations.
Based on the preliminary site sketch and technical parameters, our engineering team provided an optimized dual-booth layout:
Enclosure: Heavy-duty insulated panels lined with wear-resistant rubber sheets.
Abrasive Recovery Options: Mechanical/pneumatic recovery system designed to efficiently handle steel grit and alumina, reducing manual labor.
Dust Collection: High-efficiency reverse-pulse cartridge filter system ensuring clear visibility during operation.
Airflow Design: Downward/cross-draft airflow system ensuring uniform paint mist filtration.
Exhaust & Filtration: Multi-stage dry filtration paired with a 20meter structural exhaust stack for high-altitude emission compliance.
Handling System: Tailored floor guide/rail cart system for easy loading and unloading of 6m heavy steel pipes.
3. Technical Specifications Table
| Parameter | Abrasive Blasting Booth | Spray Painting Booth |
| External Dimensions | 8m(L)x 5m(W)x4m(H) | 8m(L)x 5m(W)x4m(H) |
| Layout Footprint | Integration 12m X 12m Total Workshop |
Integration 12m X 12m Total Workshop |
| Exhaust Stack Height | Standard Dust Filtration | 20M Vertical Chimney |
| Main Application | Rust Removal, Surface Roughing | Protective Coating, Anti-Corrosion Spraying |
| Compliance | Dust Emission Standards | Local DOE VOC Emission Standards |
A: We integrate customized multi-stage dry arrestor filters/activated carbon systems along with extended vertical exhaust chimneys to meet local air purity and emission height mandates
.
A: Yes! An 8*5 M booth length allows a 1m clearance buffer at both ends, giving operators enough room to maneuver spray equipment or operate automatic rotators for pipe coating.
Whether you have a hand-drawn sketch or complete architectural blueprints, our engineering team can turn your site dimensions into an efficient, compliant surface treatment line.