Products
PRODUCTS DETAILS
Home > Products >
High-Temperature Thermosetting Powder Curing Oven (180°C - 200°C)

High-Temperature Thermosetting Powder Curing Oven (180°C - 200°C)

MOQ: 1
Price: USD8000-USD1200/SET
Standard Packaging: With regular Film and Carton
Delivery Period: 15 DAYS After Deposit
Payment Method: T/T
Supply Capacity: 30SET/MONTH
Detail Information
Place of Origin
China
Brand Name
CoatTech
Certification
CE
Model Number
Air Conditioner Component Powder Coating Line
Main Door::
Fold Style Or Electric Rolling Style
Coating:
10-50um
Using Energy::
Diesel,gas,steam,electric Or Other Option
Noise Level:
≤80dB
Power Supply::
380V/50HZ/3Ph Or Other Option
Material:
Steel
Energy Sources::
Water, Electricity,gas
Application::
Bus/truck Or Other Metallic Products
Heating System:
Riello Brand Burner
Product Description

Hey Guys,Let us continue break this project into 4 sub project here,here is final sub project current


Project  Complete Air Conditioner Component Immersion Pretreatment & Powder Coating Production Line

Document Reference: CTI-EXP-2026-ACPC

Date: August 30,2026


Heavy-duty 108kW electric curing furnace featuring 120mm high-density rock wool insulation and dual-wing doors.

Delivers uniform cross-linking for thermosetting powders on heavy 300kg steel structures.


High-Temperature Thermosetting Powder Curing Oven (180°C - 200°C)


Project 4

3.6 Electrical Control Cabinets


Parameters

Specifications

 

Cabinet Allocation

Total 2 Control Cabinets: Cabinet 1 for Water Drying Oven & Spray Booth/Recovery; Cabinet 2 for Powder Curing Oven

Core Electrical Components

Chint Electric  premium low-voltage breakers, contactors, thermal relays, and digital temperature controllers

Control Functions

Automatic temp regulation with digital display, delayed shutdown for circulation fans, audible/visual alarms before startup/shutdown, phase loss, overload & short-circuit protection

Wiring & Cabling

Jiangyang Cable (National Standard); Sensor cables use 3-wire shielded cables to resist Electromagnetic Interference (EMC)


4. Division of Responsibilities (Scope Matrix)


To ensure clear project execution during overseas installation, tasks are divided between Buyer (Party A) and Seller (Party B) as follows:


Category

Specific Task / Item

Responsible Party

 

Electrical Works

Main power supply routing from factory substation to equipment control cabinets

Buyer (Party A)

Electrical Works

Wiring from control cabinets to individual motors, heaters, and sensors

Seller (Party B)

Civil & Plant Structure

Plant lighting, fire protection systems, general plant ventilation/exhaust ducts

Buyer (Party A)

Civil & Plant Structure

Roof openings, waterproofing/leak sealing, wastewater/exhaust treatment facilities

Buyer (Party A)

Civil & Plant Structure

Civil foundation, reinforced concrete floor, trenching, and drainage channels

Buyer (Party A)

Utilities Piping

Water/Compressed air supply piping up to equipment connection points

Buyer (Party A)

Utilities Piping

Piping, valves, and pneumatic lines from equipment connection points to internal actuators

Seller (Party B)

On-site Installation

Equipment unloading, provision of forklift, crane, installation electricity and power

Buyer (Party A)

On-site Installation

Physical positioning, mechanical assembly, electrical wiring, and system commissioning

Seller (Party B)

Logistics & Living

Accommodations, meals, and local transport for Seller's installation engineers

Buyer (Party A)


5. Commercial Quotation Summary


Pricing Terms: All figures listed below represent FOB China Port net equipment price in USD (USD/RMB exchange rate = 6.7, including a coefficient factor of 1.3). Overseas freight, international shipping, local taxes, custom duties, and installation labor fees are excluded unless explicitly itemized.


No.

Equipment Module Description

Specification Summary

Qty

Price (USD)

 

1

Immersion Pretreatment System

4 Tanks (L4.5m × W2.0m × H3.5m), 3.0mm SUS Stainless inner, 100mm tubing outer

1 Set

$27,164.18

2

Electric Powder Curing Oven

L4.5m × W3.09m × H4.1m, 120mm Rockwool insulation, double doors

1 Set

$2,522.39

3

Curing Oven Heating System

108 kW electric finned tubes (2kW × 54), 5.5kW high-temp circulation fan

1 Set

$2,328.36

4

Suspension Overhead Track

MY-XT-200 Heavy track (30m total), gantry structure, 24 trolley wheels

1 Set

$1,746.27

5

Powder Spray Booth & 1st Recovery

L4.5m × W2.5m × H4.1m, 50mm Rockwool panels, 7-cartridge pulse recovery

1 Set

$6,597.01

6

Secondary Powder Recovery Tower

L1.4m × W1.4m × H4.0m, 9 Nano-film cartridges, 15 kW exhaust fan, silencer box

1 Set

$6,985.07

7

Electric Water Moisture Drying Oven

L4.5m × W3.09m × H3.8m, 120mm Rockwool insulation, double doors

1 Set

$2,328.36

8

Drying Oven Heating System

84 kW electric finned tubes (2kW × 42), 5.5kW high-temp circulation fan

1 Set

$1,940.30

9

Manual Electrostatic Powder Gun

2026 Smart Dual-Digital Display Gun, SS hopper, KCI powder pump, cart

1 Set

$1,358.21

10

Centralized Control System

2 Sets Control Cabinets, Chint breakers/switches, EMC shielded sensor wires

2 Sets

$2,522.39

11

Surface Painting & Finishing

Putty filling, anti-rust primer coat, final polyurethane topcoat finish

1 Lot

$388.06

12

Factory Fabrication Labor

Factory structural fabrication, cutting, welding, and assembly labor

1 Lot

$6,208.96

TOTAL PRICE (EXW / FOB China Port, Excl. Tax & Freight):

$62,089.55 USD


6. Quality Assurance, Installation & After-Sales Service

Warranty Period: 12 months starting from the date of final operational acceptance at Buyer's site.


● Manufacturing Quality: All equipment structural panels are prefabricated in modular knock-down units to facilitate overseas sea freight shipping in standard high-cube (40HQ) containers.

● Warranty Repairs: Free repair or replacement for parts defective due to design or manufacturing faults during the warranty period. For operator-induced misoperations, replacement parts are supplied at cost.

● Technical Support & Response: Remote technical assistance provided within 2 hours of fault notification. If site dispatch is required, certified engineers will be deployed within 48 hours.

● Training Services: Includes a minimum of 3 days of hands-on training for Buyer's operators and maintenance staff covering operation, daily preventive maintenance, and basic troubleshooting.


Today,we had finished this project Proposal and Quotation.



High-Temperature Thermosetting Powder Curing Oven (180°C - 200°C)

High-Temperature Thermosetting Powder Curing Oven (180°C - 200°C)

High-Temperature Thermosetting Powder Curing Oven (180°C - 200°C)

High-Temperature Thermosetting Powder Curing Oven (180°C - 200°C)

High-Temperature Thermosetting Powder Curing Oven (180°C - 200°C)


Products
PRODUCTS DETAILS
High-Temperature Thermosetting Powder Curing Oven (180°C - 200°C)
MOQ: 1
Price: USD8000-USD1200/SET
Standard Packaging: With regular Film and Carton
Delivery Period: 15 DAYS After Deposit
Payment Method: T/T
Supply Capacity: 30SET/MONTH
Detail Information
Place of Origin
China
Brand Name
CoatTech
Certification
CE
Model Number
Air Conditioner Component Powder Coating Line
Main Door::
Fold Style Or Electric Rolling Style
Coating:
10-50um
Using Energy::
Diesel,gas,steam,electric Or Other Option
Noise Level:
≤80dB
Power Supply::
380V/50HZ/3Ph Or Other Option
Material:
Steel
Energy Sources::
Water, Electricity,gas
Application::
Bus/truck Or Other Metallic Products
Heating System:
Riello Brand Burner
Minimum Order Quantity:
1
Price:
USD8000-USD1200/SET
Packaging Details:
With regular Film and Carton
Delivery Time:
15 DAYS After Deposit
Payment Terms:
T/T
Supply Ability:
30SET/MONTH
Product Description

Hey Guys,Let us continue break this project into 4 sub project here,here is final sub project current


Project  Complete Air Conditioner Component Immersion Pretreatment & Powder Coating Production Line

Document Reference: CTI-EXP-2026-ACPC

Date: August 30,2026


Heavy-duty 108kW electric curing furnace featuring 120mm high-density rock wool insulation and dual-wing doors.

Delivers uniform cross-linking for thermosetting powders on heavy 300kg steel structures.


High-Temperature Thermosetting Powder Curing Oven (180°C - 200°C)


Project 4

3.6 Electrical Control Cabinets


Parameters

Specifications

 

Cabinet Allocation

Total 2 Control Cabinets: Cabinet 1 for Water Drying Oven & Spray Booth/Recovery; Cabinet 2 for Powder Curing Oven

Core Electrical Components

Chint Electric  premium low-voltage breakers, contactors, thermal relays, and digital temperature controllers

Control Functions

Automatic temp regulation with digital display, delayed shutdown for circulation fans, audible/visual alarms before startup/shutdown, phase loss, overload & short-circuit protection

Wiring & Cabling

Jiangyang Cable (National Standard); Sensor cables use 3-wire shielded cables to resist Electromagnetic Interference (EMC)


4. Division of Responsibilities (Scope Matrix)


To ensure clear project execution during overseas installation, tasks are divided between Buyer (Party A) and Seller (Party B) as follows:


Category

Specific Task / Item

Responsible Party

 

Electrical Works

Main power supply routing from factory substation to equipment control cabinets

Buyer (Party A)

Electrical Works

Wiring from control cabinets to individual motors, heaters, and sensors

Seller (Party B)

Civil & Plant Structure

Plant lighting, fire protection systems, general plant ventilation/exhaust ducts

Buyer (Party A)

Civil & Plant Structure

Roof openings, waterproofing/leak sealing, wastewater/exhaust treatment facilities

Buyer (Party A)

Civil & Plant Structure

Civil foundation, reinforced concrete floor, trenching, and drainage channels

Buyer (Party A)

Utilities Piping

Water/Compressed air supply piping up to equipment connection points

Buyer (Party A)

Utilities Piping

Piping, valves, and pneumatic lines from equipment connection points to internal actuators

Seller (Party B)

On-site Installation

Equipment unloading, provision of forklift, crane, installation electricity and power

Buyer (Party A)

On-site Installation

Physical positioning, mechanical assembly, electrical wiring, and system commissioning

Seller (Party B)

Logistics & Living

Accommodations, meals, and local transport for Seller's installation engineers

Buyer (Party A)


5. Commercial Quotation Summary


Pricing Terms: All figures listed below represent FOB China Port net equipment price in USD (USD/RMB exchange rate = 6.7, including a coefficient factor of 1.3). Overseas freight, international shipping, local taxes, custom duties, and installation labor fees are excluded unless explicitly itemized.


No.

Equipment Module Description

Specification Summary

Qty

Price (USD)

 

1

Immersion Pretreatment System

4 Tanks (L4.5m × W2.0m × H3.5m), 3.0mm SUS Stainless inner, 100mm tubing outer

1 Set

$27,164.18

2

Electric Powder Curing Oven

L4.5m × W3.09m × H4.1m, 120mm Rockwool insulation, double doors

1 Set

$2,522.39

3

Curing Oven Heating System

108 kW electric finned tubes (2kW × 54), 5.5kW high-temp circulation fan

1 Set

$2,328.36

4

Suspension Overhead Track

MY-XT-200 Heavy track (30m total), gantry structure, 24 trolley wheels

1 Set

$1,746.27

5

Powder Spray Booth & 1st Recovery

L4.5m × W2.5m × H4.1m, 50mm Rockwool panels, 7-cartridge pulse recovery

1 Set

$6,597.01

6

Secondary Powder Recovery Tower

L1.4m × W1.4m × H4.0m, 9 Nano-film cartridges, 15 kW exhaust fan, silencer box

1 Set

$6,985.07

7

Electric Water Moisture Drying Oven

L4.5m × W3.09m × H3.8m, 120mm Rockwool insulation, double doors

1 Set

$2,328.36

8

Drying Oven Heating System

84 kW electric finned tubes (2kW × 42), 5.5kW high-temp circulation fan

1 Set

$1,940.30

9

Manual Electrostatic Powder Gun

2026 Smart Dual-Digital Display Gun, SS hopper, KCI powder pump, cart

1 Set

$1,358.21

10

Centralized Control System

2 Sets Control Cabinets, Chint breakers/switches, EMC shielded sensor wires

2 Sets

$2,522.39

11

Surface Painting & Finishing

Putty filling, anti-rust primer coat, final polyurethane topcoat finish

1 Lot

$388.06

12

Factory Fabrication Labor

Factory structural fabrication, cutting, welding, and assembly labor

1 Lot

$6,208.96

TOTAL PRICE (EXW / FOB China Port, Excl. Tax & Freight):

$62,089.55 USD


6. Quality Assurance, Installation & After-Sales Service

Warranty Period: 12 months starting from the date of final operational acceptance at Buyer's site.


● Manufacturing Quality: All equipment structural panels are prefabricated in modular knock-down units to facilitate overseas sea freight shipping in standard high-cube (40HQ) containers.

● Warranty Repairs: Free repair or replacement for parts defective due to design or manufacturing faults during the warranty period. For operator-induced misoperations, replacement parts are supplied at cost.

● Technical Support & Response: Remote technical assistance provided within 2 hours of fault notification. If site dispatch is required, certified engineers will be deployed within 48 hours.

● Training Services: Includes a minimum of 3 days of hands-on training for Buyer's operators and maintenance staff covering operation, daily preventive maintenance, and basic troubleshooting.


Today,we had finished this project Proposal and Quotation.



High-Temperature Thermosetting Powder Curing Oven (180°C - 200°C)

High-Temperature Thermosetting Powder Curing Oven (180°C - 200°C)

High-Temperature Thermosetting Powder Curing Oven (180°C - 200°C)

High-Temperature Thermosetting Powder Curing Oven (180°C - 200°C)

High-Temperature Thermosetting Powder Curing Oven (180°C - 200°C)


sitemap |  Privacy Policy | China Good Quality Spray Booth Supplier. Copyright © 2024-2026 CoatTech Intelligent Equipment(Guangzhou) CO.,LTD . All Rights Reserved.