| MOQ: | 1 |
| Price: | USD8000-USD1200/SET |
| Standard Packaging: | With regular Film and Carton |
| Delivery Period: | 15 DAYS After Deposit |
| Payment Method: | T/T |
| Supply Capacity: | 30SET/MONTH |
Hey Guys,Let us continue break this project into 4 sub project here,here is final sub project current
Project Complete Air Conditioner Component Immersion Pretreatment & Powder Coating Production Line
Document Reference: CTI-EXP-2026-ACPC
Date: August 30,2026
Heavy-duty 108kW electric curing furnace featuring 120mm high-density rock wool insulation and dual-wing doors.
Delivers uniform cross-linking for thermosetting powders on heavy 300kg steel structures.
![]()
Project 4
|
Parameters |
Specifications
|
|
Cabinet Allocation |
Total 2 Control Cabinets: Cabinet 1 for Water Drying Oven & Spray Booth/Recovery; Cabinet 2 for Powder Curing Oven |
|
Core Electrical Components |
Chint Electric premium low-voltage breakers, contactors, thermal relays, and digital temperature controllers |
|
Control Functions |
Automatic temp regulation with digital display, delayed shutdown for circulation fans, audible/visual alarms before startup/shutdown, phase loss, overload & short-circuit protection |
|
Wiring & Cabling |
Jiangyang Cable (National Standard); Sensor cables use 3-wire shielded cables to resist Electromagnetic Interference (EMC) |
To ensure clear project execution during overseas installation, tasks are divided between Buyer (Party A) and Seller (Party B) as follows:
|
Category |
Specific Task / Item |
Responsible Party
|
|
Electrical Works |
Main power supply routing from factory substation to equipment control cabinets |
Buyer (Party A) |
|
Electrical Works |
Wiring from control cabinets to individual motors, heaters, and sensors |
Seller (Party B) |
|
Civil & Plant Structure |
Plant lighting, fire protection systems, general plant ventilation/exhaust ducts |
Buyer (Party A) |
|
Civil & Plant Structure |
Roof openings, waterproofing/leak sealing, wastewater/exhaust treatment facilities |
Buyer (Party A) |
|
Civil & Plant Structure |
Civil foundation, reinforced concrete floor, trenching, and drainage channels |
Buyer (Party A) |
|
Utilities Piping |
Water/Compressed air supply piping up to equipment connection points |
Buyer (Party A) |
|
Utilities Piping |
Piping, valves, and pneumatic lines from equipment connection points to internal actuators |
Seller (Party B) |
|
On-site Installation |
Equipment unloading, provision of forklift, crane, installation electricity and power |
Buyer (Party A) |
|
On-site Installation |
Physical positioning, mechanical assembly, electrical wiring, and system commissioning |
Seller (Party B) |
|
Logistics & Living |
Accommodations, meals, and local transport for Seller's installation engineers |
Buyer (Party A) |
Pricing Terms: All figures listed below represent FOB China Port net equipment price in USD (USD/RMB exchange rate = 6.7, including a coefficient factor of 1.3). Overseas freight, international shipping, local taxes, custom duties, and installation labor fees are excluded unless explicitly itemized.
|
No. |
Equipment Module Description |
Specification Summary |
Qty |
Price (USD)
|
|
1 |
Immersion Pretreatment System |
4 Tanks (L4.5m × W2.0m × H3.5m), 3.0mm SUS Stainless inner, 100mm tubing outer |
1 Set |
$27,164.18 |
|
2 |
Electric Powder Curing Oven |
L4.5m × W3.09m × H4.1m, 120mm Rockwool insulation, double doors |
1 Set |
$2,522.39 |
|
3 |
Curing Oven Heating System |
108 kW electric finned tubes (2kW × 54), 5.5kW high-temp circulation fan |
1 Set |
$2,328.36 |
|
4 |
Suspension Overhead Track |
MY-XT-200 Heavy track (30m total), gantry structure, 24 trolley wheels |
1 Set |
$1,746.27 |
|
5 |
Powder Spray Booth & 1st Recovery |
L4.5m × W2.5m × H4.1m, 50mm Rockwool panels, 7-cartridge pulse recovery |
1 Set |
$6,597.01 |
|
6 |
Secondary Powder Recovery Tower |
L1.4m × W1.4m × H4.0m, 9 Nano-film cartridges, 15 kW exhaust fan, silencer box |
1 Set |
$6,985.07 |
|
7 |
Electric Water Moisture Drying Oven |
L4.5m × W3.09m × H3.8m, 120mm Rockwool insulation, double doors |
1 Set |
$2,328.36 |
|
8 |
Drying Oven Heating System |
84 kW electric finned tubes (2kW × 42), 5.5kW high-temp circulation fan |
1 Set |
$1,940.30 |
|
9 |
Manual Electrostatic Powder Gun |
2026 Smart Dual-Digital Display Gun, SS hopper, KCI powder pump, cart |
1 Set |
$1,358.21 |
|
10 |
Centralized Control System |
2 Sets Control Cabinets, Chint breakers/switches, EMC shielded sensor wires |
2 Sets |
$2,522.39 |
|
11 |
Surface Painting & Finishing |
Putty filling, anti-rust primer coat, final polyurethane topcoat finish |
1 Lot |
$388.06 |
|
12 |
Factory Fabrication Labor |
Factory structural fabrication, cutting, welding, and assembly labor |
1 Lot |
$6,208.96 |
|
TOTAL PRICE (EXW / FOB China Port, Excl. Tax & Freight): |
$62,089.55 USD |
|||
Warranty Period: 12 months starting from the date of final operational acceptance at Buyer's site.
● Manufacturing Quality: All equipment structural panels are prefabricated in modular knock-down units to facilitate overseas sea freight shipping in standard high-cube (40HQ) containers.
● Warranty Repairs: Free repair or replacement for parts defective due to design or manufacturing faults during the warranty period. For operator-induced misoperations, replacement parts are supplied at cost.
● Technical Support & Response: Remote technical assistance provided within 2 hours of fault notification. If site dispatch is required, certified engineers will be deployed within 48 hours.
● Training Services: Includes a minimum of 3 days of hands-on training for Buyer's operators and maintenance staff covering operation, daily preventive maintenance, and basic troubleshooting.
Today,we had finished this project Proposal and Quotation.
![]()
![]()
![]()
![]()
![]()
| MOQ: | 1 |
| Price: | USD8000-USD1200/SET |
| Standard Packaging: | With regular Film and Carton |
| Delivery Period: | 15 DAYS After Deposit |
| Payment Method: | T/T |
| Supply Capacity: | 30SET/MONTH |
Hey Guys,Let us continue break this project into 4 sub project here,here is final sub project current
Project Complete Air Conditioner Component Immersion Pretreatment & Powder Coating Production Line
Document Reference: CTI-EXP-2026-ACPC
Date: August 30,2026
Heavy-duty 108kW electric curing furnace featuring 120mm high-density rock wool insulation and dual-wing doors.
Delivers uniform cross-linking for thermosetting powders on heavy 300kg steel structures.
![]()
Project 4
|
Parameters |
Specifications
|
|
Cabinet Allocation |
Total 2 Control Cabinets: Cabinet 1 for Water Drying Oven & Spray Booth/Recovery; Cabinet 2 for Powder Curing Oven |
|
Core Electrical Components |
Chint Electric premium low-voltage breakers, contactors, thermal relays, and digital temperature controllers |
|
Control Functions |
Automatic temp regulation with digital display, delayed shutdown for circulation fans, audible/visual alarms before startup/shutdown, phase loss, overload & short-circuit protection |
|
Wiring & Cabling |
Jiangyang Cable (National Standard); Sensor cables use 3-wire shielded cables to resist Electromagnetic Interference (EMC) |
To ensure clear project execution during overseas installation, tasks are divided between Buyer (Party A) and Seller (Party B) as follows:
|
Category |
Specific Task / Item |
Responsible Party
|
|
Electrical Works |
Main power supply routing from factory substation to equipment control cabinets |
Buyer (Party A) |
|
Electrical Works |
Wiring from control cabinets to individual motors, heaters, and sensors |
Seller (Party B) |
|
Civil & Plant Structure |
Plant lighting, fire protection systems, general plant ventilation/exhaust ducts |
Buyer (Party A) |
|
Civil & Plant Structure |
Roof openings, waterproofing/leak sealing, wastewater/exhaust treatment facilities |
Buyer (Party A) |
|
Civil & Plant Structure |
Civil foundation, reinforced concrete floor, trenching, and drainage channels |
Buyer (Party A) |
|
Utilities Piping |
Water/Compressed air supply piping up to equipment connection points |
Buyer (Party A) |
|
Utilities Piping |
Piping, valves, and pneumatic lines from equipment connection points to internal actuators |
Seller (Party B) |
|
On-site Installation |
Equipment unloading, provision of forklift, crane, installation electricity and power |
Buyer (Party A) |
|
On-site Installation |
Physical positioning, mechanical assembly, electrical wiring, and system commissioning |
Seller (Party B) |
|
Logistics & Living |
Accommodations, meals, and local transport for Seller's installation engineers |
Buyer (Party A) |
Pricing Terms: All figures listed below represent FOB China Port net equipment price in USD (USD/RMB exchange rate = 6.7, including a coefficient factor of 1.3). Overseas freight, international shipping, local taxes, custom duties, and installation labor fees are excluded unless explicitly itemized.
|
No. |
Equipment Module Description |
Specification Summary |
Qty |
Price (USD)
|
|
1 |
Immersion Pretreatment System |
4 Tanks (L4.5m × W2.0m × H3.5m), 3.0mm SUS Stainless inner, 100mm tubing outer |
1 Set |
$27,164.18 |
|
2 |
Electric Powder Curing Oven |
L4.5m × W3.09m × H4.1m, 120mm Rockwool insulation, double doors |
1 Set |
$2,522.39 |
|
3 |
Curing Oven Heating System |
108 kW electric finned tubes (2kW × 54), 5.5kW high-temp circulation fan |
1 Set |
$2,328.36 |
|
4 |
Suspension Overhead Track |
MY-XT-200 Heavy track (30m total), gantry structure, 24 trolley wheels |
1 Set |
$1,746.27 |
|
5 |
Powder Spray Booth & 1st Recovery |
L4.5m × W2.5m × H4.1m, 50mm Rockwool panels, 7-cartridge pulse recovery |
1 Set |
$6,597.01 |
|
6 |
Secondary Powder Recovery Tower |
L1.4m × W1.4m × H4.0m, 9 Nano-film cartridges, 15 kW exhaust fan, silencer box |
1 Set |
$6,985.07 |
|
7 |
Electric Water Moisture Drying Oven |
L4.5m × W3.09m × H3.8m, 120mm Rockwool insulation, double doors |
1 Set |
$2,328.36 |
|
8 |
Drying Oven Heating System |
84 kW electric finned tubes (2kW × 42), 5.5kW high-temp circulation fan |
1 Set |
$1,940.30 |
|
9 |
Manual Electrostatic Powder Gun |
2026 Smart Dual-Digital Display Gun, SS hopper, KCI powder pump, cart |
1 Set |
$1,358.21 |
|
10 |
Centralized Control System |
2 Sets Control Cabinets, Chint breakers/switches, EMC shielded sensor wires |
2 Sets |
$2,522.39 |
|
11 |
Surface Painting & Finishing |
Putty filling, anti-rust primer coat, final polyurethane topcoat finish |
1 Lot |
$388.06 |
|
12 |
Factory Fabrication Labor |
Factory structural fabrication, cutting, welding, and assembly labor |
1 Lot |
$6,208.96 |
|
TOTAL PRICE (EXW / FOB China Port, Excl. Tax & Freight): |
$62,089.55 USD |
|||
Warranty Period: 12 months starting from the date of final operational acceptance at Buyer's site.
● Manufacturing Quality: All equipment structural panels are prefabricated in modular knock-down units to facilitate overseas sea freight shipping in standard high-cube (40HQ) containers.
● Warranty Repairs: Free repair or replacement for parts defective due to design or manufacturing faults during the warranty period. For operator-induced misoperations, replacement parts are supplied at cost.
● Technical Support & Response: Remote technical assistance provided within 2 hours of fault notification. If site dispatch is required, certified engineers will be deployed within 48 hours.
● Training Services: Includes a minimum of 3 days of hands-on training for Buyer's operators and maintenance staff covering operation, daily preventive maintenance, and basic troubleshooting.
Today,we had finished this project Proposal and Quotation.
![]()
![]()
![]()
![]()
![]()